The given diagrams provide information about the comparison of the biology school at a particular university in the present with the prediction plan, which is a development and renovation project.
Overall, the most dramatic renovation and notable area is in the bottom right-hand corner, which experienced several expansions and additions of functional spaces. Those arrangements are mainly focused on teaching facilities. Furthermore, there are also some minor changes, such as several recreation facilities that have slight modifications.
The main crescent-shaped road is going to remain unchanged, along with the planned staffs’ car park occupying the pine tree area in the southwest corner. Next, there is a central woodland in the north of the present design; this large area will then be dispersed, and a new lab and office are going to be constructed in the middle.
There are also some untouched areas in the central and the top right-hand corner of the plan, which are the central library and the indoor sports hall. Moreover, the drama center will be replaced by the music center and located in the east of the library. According to the renovation plan for the university’s southern side, the single-floor teaching building and lecture room are going to be expanded vertically with a new upper level. Likewise, the IT center will be enlarged significantly. Lastly, the cafe between the teaching building and the lecture room will stay the same.
