The diagrams illustrate changes to a school layout in 1985 and in present time.
Overall, since the population of school has increased, the school have been expanded with educational and sport facilities. However, infostructure has changed and playing amenities have been decreased.
To start with, the changes have been driven by the growing school population from 1500 to 2300 students, this is the cause of redevelopment of the school site. In the northern part the library, car park, and the classroom block (two storeys) have been demolished to build Learning Resources Centre with computer room inside. Moreover, a more spacious 3 storeys classroom block, next to which some trees have been planted, has been built. A road has been reconstructed to semicircle shape and the car park beside have been expanded northwards. The office has witnessed minimal changes.
In the southern section, the part of the land has been redeveloped into a new sport complex, which consists of the pool and the fitness centre. The playing fields have been reduced to provide enough space for additional classrooms next to sport facilities in the east and a three storeys building below in the west.
