The plan A and B depict the refurbishment of a health center in the two years, 2005 and the present.
Overall, it is obvious that the health center has witnessed various remarkable developments. Most noticeably, the main hall of the center has been enlarged and its layout has also been changed for more purpose.
Looking at the map, the main entrance was in front of the center in 2005 but is now located in the left corner of the map. Adjacent to the entrance is a reception desk in the left situated at the end of the the hall in 2005 and an area for children to play in the right which the center didn’t have in the past. Passing through the reception desk, the large common area in the middle of the center has been broadened to welcome more patients with more available seats alongside the wall.
Another striking change is the layout of the health center. In 2005, it just had an office, three consultation rooms surrounding the hall and a physiotherapy room built behind the desk. Nowadays, all original rooms are remained; moreover; a new minor operations room has been erected between the office and the physiotherapy room in the top left-hand corner of the map. Besides, there is an appearance of the fourth consultation room, and all the CR have been allocated to the southeast. Finally, the size of the car park increased by twice from 12 to 30 spaces.
