🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

Image for topic: The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two hospital grounds with an ambulance cursor icon display at the centre as common ground, with people and staff exiting and entering grounds. The city hospital on the left has car park lots reserves for doctors and physiotherapists, with a label pointing to emergency, with symbols of a female, disabled, male and baby changing. The city hospital on the right also has car park lots for staff and a label pointing to a pharmacy, pathology and physiotherapy, as well as symbols of female, disabled, male and baby changing. Furthermore, on the top left of the image, there is a compass indicating directions, with 'N' pointing upwards and a 90 degrees arrow pointing towards the right side of the image to wards what labeled as 'city centre'
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate the previous plan of road access to a city hospital before and after renovation in the years 2007 and 2010.

It is clear that a number of modifications have been made after its refertilization including roundabout, bus station, staff car park, and public car park.

Looking at the two maps in more detail, there was a city hospital surrounded by the ring road in 2007 and this shape was not changed after three years. Although the hospital road was connected directly to the ring road in front of the hospital, a roundabout was constructed in the junction of the ring road and hospital road three years later, which was joined by the newly added bus station on the southwest corner of the roundabout.

According to the rebuilding of the street access, in the southern area, another roundabout was built between the hospital route and city road. A side road from the new roundabout reached the bus station and made an angle like Y. Moreover, a car park was situated on the left side of the hospital road below the city hospital, which was used not only by the staff but also by the public. In contrast, after its refurbishment, a new car park was built for public use on the eastern part of the city hospital in the year 2010.

Word Count: 223

Answers On The Same Topic:

The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

The provided maps illustrate the infrastructural developments regarding road access to a city hospital over a three-year period, specifically between 2007 and 2010. Overall, the hospital site underwent a significant transformation, characterized by the modernization of the transport network and the reorganization of parking facilities. The most notable changes include the introduction of roundabouts and […]

The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

The two maps illustrate the road access to a city hospital in 2007 and in 2010. Overall, while the hospital building remained in the same location, several changes were made to improve traffic flow and accessibility, including the construction of roundabouts, the separation of parking areas, and the relocation of the bus stop. In 2007, […]

The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

The two maps illustrate the changes made to the road access around the City Hospital between 2007 and 2010. Overall, the area underwent significant redevelopment, with major upgrades to traffic flow, parking arrangements, and public transport facilities. The most notable modifications include the addition of two roundabouts, the construction of a new public car park, […]

The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

The two maps illustrate the changes made to the road access surrounding a city hospital between 2007 and 2010. Overall, the infrastructure around the hospital became more organized and convenient over the three-year period, with the addition of public transport facilities and dedicated car parks for staff and the public. In 2007, the hospital was […]

The two maps below show road access to a city hospital in 2007 and in 2010. Summarise the information by selecting and reporting the main feature , and make comparisons where relevant.

The two diagrams demonstrate road facilities to a city hospital in the years 2007 and 2010. Overall, the road access to the city hospital was extended with the addition of new roundabouts, a bus station, and other facilities. In 2007, the city hospital was surrounded by a ring road, a city road in the far […]

See All

Other Topics:

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The illustration delineates the changes to a college cafe after renovation. It can be observed that the cafe has become more accomidation along with addition of food stalls. Initially,upon enter the cafe two private staff dining was present on the right side. Near the enterence, on the left side bines were provided and to the […]

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The diagramm illustrates process by which college local cafe is manufacturing. Overall, the essential changings were on the kitchen and at the main room. Moreover, there added a lot of new furnitures on outside. The plan of the cafe was extended with outdoor seating and barbecue zones. Location of the toilet does not change. First […]

The maps below show changes in a rural area between 1970 and 2010.

The two maps illustrate the changes that took place in a rural area over a 40-year period starting in 1970. Overall, the most notable changes involve the replacement of the farmland with an industrial area and the addition of a football pitch, while the school has remained largely unchanged. In 1970, there was a playing […]

The plans below show how the ground floor of a particular building has changed over time. Summarize the information by selecting and reporting the main features. You must write at least 140 words

The map depicts changes that occurred to a ground floor of a building, in terms of its layout and purposes of use. Overall, the floor has undergone radical changes, transforming from an office to a flat, and finally into a flower store. Notably, despite these dramatic modifications, the entrance and the kitchen remain in its […]

The plans below show a natural history museum in 2010,and the same museum in 2013. Summarise the information by selecting and reporting the main features, and make comparisons where relevant

The two maps illustrate the transformation of a natural history museum from 2010 to 2013. Overall, the natural history museum has become more diverse and visitor-friendly with the introduction of a range of new facilities. It is also clear that the majority of the changes took place on the left and right sides of the […]

The maps below show an archaeological site before and after excavation

The given pictures illustrate how contemporary archaeological findings at a historic site changed between 2004 and 2014. Overall, the site underwent a number of significant changes, the most important of which are the construction of three ancient features and the expansion of ancient accommodations. In addition, the changes catered for a better tourist experience. In […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.