The map demonstrates how a healthcare centre developed from 2005 to nowadays.
Overall, it is clear that while only the physiotherapy room remained, the arrangement of the whole centre significantly changed throughout the period of time.
First in 2005, outside of the health centre, there was a parking area with 12 spaces in front of the building, surrounded by a huge garden. Going inside, the main entrance was initially on the south side of the building, leading to a rectangular hall with a reception desk located at the end of it. The CR3 was the first room on the left hand side of the main entrance, right next to the office room. CR1 and 2 were located on the opposite of CR3 and the office while the physiotherapy room was in the northeast corner of the building.
Concerning the present day’s arrangement of the centre, the car park is enlarged which accommodate 30 vehicles while one-third of the garden is demolished to make way for a new entrance in the southwest corner of the building. The main hall nowadays transforms into a square shape since a new minor operations room is built up in the northwest corner where it used to be a part of the garden. The office room now is the first room from the main entrance, behind the reception desk. A playground area is also included right next to the CR1 and CR2, located at the space of the old entrance door. CR3 and 4 are adjacent to one another and are moved to the east side of the building.
