The map illustrates the recent makeover of Biomedical Campus and the planing scheme of it.
Overall, it can be seen that Biomedical Campus is served as an environmental site now and then it is planned to turn into experimental area, with the erection of Genetics and expansion of Biochemestry.
Regarding the present layout of Biomedical Campus, car park is spotted on the right-top side of the Campus along with Lab which is located to opposite of Car park. Having that, Road crosses between these two amenities. Today, Campus is surrended by a wide range of trees, making it eco-friendly area. The Road channel into southern part which divide the Campus two: left and right. Biochemestry is situated to the left of road, with lab nearby and Genetics and Biotech are spotted to the right of road.
As for planned Biomedical Campus which convert into research area, with Genetics 1 which is planned to construct to the northern-west of Campus. Trees are chopped down to make way for building Bioimaging. Only single tree is preserved. Car park is replaced with student car park. Road which used to cross in the centre of campus is knocked down and converted into merged high road. Two lab stayed almost intact with small adjustments. New staff car park is erected from scratch which is located in the southern-west of Campus. Biotech is enlarged and consist of seme-detached rooms. Although Genetics 1 is turned into Genetics 2, it’s position stayed unchanged. Finally, while the economic aspect of Campus fades away, it becomes educational area.
