The diagrams depict the process of a contemporary landfill use for managing.
Overall, the process consistsof three main stages commencing with construction followed by waste handling and waste overseeing.
First, a man-made holeis dig into natural rock. This dip holeis underlay with a thick clay, on the top of which lies a synthentic lining to prevent lack of waste materials. At the bottomof the hole, a drainage tank is installed, with drainage pipes are placed above to manage liquid waste.
At the next, after landfill is built, it has gradually filled by household waste. When watses are filled, any liquid watse pump through drainage pipes into the under tank. Finally, landfill is filled up, it is covered a clay. Gases from biodergradation are collected and discharged through a pipe connected to the drainage system.