The provided diagrams depict the layout of a school site in 2004 and the proposed changes to the site in 2024.
Overall, the changes to the school site from 2004 to 2024 include the addition of a new school building, a car park, and a road leading to car park 2. Additionally, the area of the forest has been somewhat reduced, and the path leading to the school buildings and sports field has undergone significant changes.
In 2004, the school site comprised three school buildings, one entrance, a path leading to the buildings and sports field, and a spacious sports field to the left. However, by 2024, the site had undergone notable changes. The original sports field had been replaced by the construction of a new school building, labeled as school building 3. This alteration allowed the inclusion of a smaller sports field opposite school building 3, across the road. Furthermore, a new road was added beside school building 2, and a car park, denoted as car park 2, was established on the north side of the map next to school building 3, enabling the school site to accommodate 1000 students, up from 600 in 2004.
The path leading to the school buildings and sports field in 2004 largely disappeared due to the combination of school building 1 and school building 2. However, by 2024, the path was replaced by two separate paths, and school building 3 was constructed in the area previously occupied by the sports field. The layout of the main road, car park 1, and main entrance remained unchanged over the 20-year period. Notably, the forest area also experienced a reduction in size, and its bottom portion remained largely unaltered.
