The provided diagram illustrates the overall view of a school in 2004 and the planning for its expansion in the next 20 years.
Overall, the school is anticipated to expand its infrastructures, leading to the change of the road system. These alterations will allow school’s capacity to receive more students in 2024.
The most notable change expected in 2024 is the expansion of the school building. The original buildings will be connected by an additional tower, leading to the cut of the path currently connecting the sports fields and the main entrance. This school will also build a new school building by downscaling the big sport field in 2004. A new car park will also be constructed in this area. To connect this recently-built car park with the main entrance, a new road will be made. The remaining sports field will be located in the other side of the road that has the school buildings. With these changes, the school is expected to have 400 students more to attend after 20 years.
Apart from the changes, the school will remain the locations of the first car park, main entrance and the majority of the trees opposite the school.
