Two pictures compare the layout of a school as it was in the year 2004 with a proposed site design for the year 2024.
It is clear that a new school building will be constructed in 2024 to replace for the old site. Then the school can afford to contain a larger number of students.
In 2004, there were 600 pupils attending the school, and two school buildings were seperated by a path running from the main entrance to the sports field. By 2024, it is expected that there will be 1000 pupils, and a third building will have been constructed.Furthermore, the plan is to join the two original buildings together, creating a shorter path that links the buildings only.Since the original sports field will be demolished/ destroyed to make way for the construction of the third building and a second car park, a new and smaller sports site will be built to the East of the old buildings, almost opposite to the new building.A new road also be constructed to link between the main entrance and the second car park.
Finally, the main entrance and original car park will remain unchanged during the period.
