The provided diagrams present the comparison between the layout of a school site in 2004 and the proposed changes to the site in 2024.
Overall, the planned modifications for the school site in 2024 include an increase in the number of students to 1,000, the addition of a new school building, reconfiguration of existing buildings, alterations to the path layout, relocation of the sports field, and the inclusion of a new car park and road.
In 2004, the school site accommodated 600 students with two school buildings connected by a path leading to the sports field. Contrary to this, the 2024 plan projects the capacity to increase to 1,000 students, with the addition of a third school building and the connection of the original two structures. The current sports field will be replaced by a smaller one to facilitate the construction of the new building and a supplementary car park. A shorter path will link the buildings directly without the sports field in between.
Moreover, the new sports field will be situated to the east of the old structures, opposite to the new building. To enhance accessibility, a new road will be built to connect the main entrance to the additional car park, while the original entrance and car park will remain unchanged throughout the transformation process in 2024.
