The provided diagrams present the comparison between the layout of a school site in 2004 and the proposed changes to the site in 2024.
Overall, the planned modifications for the school site in 2024 include an increase in the number of students to 1,000, the addition of a new school building, reconfiguration of existing buildings, alterations to the path layout, relocation of the sports field, and the inclusion of a new car park and road.
In 2004, there were 600 pupils attending the school, and two school buildings were separated by a path running from the main entrance to the sports field. By 2024, it is expected that there will be 1000 pupils, and a third building will have been constructed. Furthermore, the plan is to join the two original buildings together, creating a shorter path that links the buildings only. Since the original sports field will be demolished to make way for the construction of the third building and a second car park, a new and smaller sports site will be built to the east of the old buildings, almost opposite to the new building. A new road will also be constructed to link between the main entrance and the second car park.
Finally, the main entrance and original car park will remain unchanged during the period.
