The provided two maps illutrate a lay out of the public library afterword five years. Looking from an overall perspective, it is evident that there have been several notabal changes througout the given time period. However, entrance, book shelves, and meeting room remained unchanged. New places when were added current.
One remarkable observation is two private study table have added between book shelves and student laptop desks. There was four study tables in the before, but current there are six parivate study tables. The library office has been converted the conference room, however that room is not been moved in both map.
As another changes, the classroom is been enlarged into recording studio, and borrowing and reterning desk have been seperated after five years respectively,but it is been connected to gether. There was two book shelves, however one book shelves has removed by curent plan. The computer desk has been added laptop desk, and it has been connected after 5 year.
