The provided maps illustrate the changes made to an office building from the present to future development.
Overall, it is clear that several modifications will take place, including relocations, new constructions, and replacements of various facilities such as grass areas.
Looking at the maps in more detail, there are two grass areas on both side of the current map. In the future plans, the left grass area will be transformed into an outdoor activity space, while the right side will feature a coffee station at the top and a meeting area at the bottom. Additionally, the reception and entrance, which are currently located near the right grassy area, will be moved to the middle of the two offices to the south in the future layout.
Regarding the remaining changes, the kitchen and canteen currently situated on the north side of the present map will be replaced with two office rooms in the future layout. Meanwhile, the washroom, which was located in the middle of the eastern grassy area in the existing layout, will be demolished in the future. However, there are no plans to change the location of the stockroom, which is positioned at the top of the map.
