The diagrams illustrate the current layout of a college and its proposed redevelopment in 2020. Overall, it is clear that the college is set to undergo extensive modernization and expansion, with the only facility remaining intact being the lunch area and bus stop. Instead, a larger car park will be constructed. Although many classrooms have been added, the future design will remove the footpaths and the garden.
Currently, there are two footpaths running across the site, separating the main building from the garden and the car park. The existing car park has a maximum capacity of only four cars. At present, the main building contains three classrooms: two on the right side of the entrance and one on the left.
In the new design, the entrance will be relocated to the opposite side of the building, next to the road. There will be four classrooms on the right side and one on the left. The reception area will also be moved from its current location to the main corridor, while the library will be transferred to the opposite side. Additionally, the toilets will be situated in a different location from where they are now. In the top left corner of the building, a new shopping area will be created. Finally, the car park will be expanded to accommodate seven cars, while the bus station and road will remain unchanged.
