The maps illustrate the current college site and the project for it in 2020. It can be seen that the area for garden and footpath in the north will be replaced for a larger car park and building. Moreover, there will be more classrooms and a new shop in the main building.
At the present, the entrance is near the footpath in the north and opposite the toilet. However, they will exchange their location in the future. On the left side of the door, there is a lunch area, whose half of space will be replaced by a new shop. There will be three more classrooms along the east of the building instead of a library at the bottom left corner and a reception above it. The reception will be narrowed and moved to the middle while the library will be situated to the west of the new entrance. Therefore, the new library will be next to a classroom that will remain unchanged in 2020.
There is a garden in the northern area of the college site. It is parallel to the footpath that leads to the bus stop and road at the bottom. However, the garden and the footpath will be removed to give place for expanding the car park on the left-hand side and the main building on the other side. Although the location of the bus stop will not be changed, it will be widened to the north and along the northern road.
