Our system will evaluate the answer based on this AI-generated description.
The image contains two maps, one labeled "Present College" and the other "Plan in 2020". Both maps have a road at the bottom with a bus stop to the right, a car park on the left with 6 red car symbols indicating parking spaces, and a labeled garden at the top. A dotted line indicating footpath traverses from the bus stop through the center of the maps upwards. In the Present College, from left to right, there are two Classroom blocks, a Lunch Area, Reception, Toilet, and Library. In the Plan in 2020, from left to right, there are two Classroom blocks, Shop, Lunch Area, Classroom, Reception, Toilet, Library, and an additional Classroom block.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The maps illustrate the current state of a college building and the outside area and future development in 2020.
Overall, it is evident that there will be various changes happen to the college in the future and clearly it will get expanded.
The first and noticeable change is about footpath and garden. Footpath and garden will be removed and instead, college building expanded and from the left side same thing happen to the car park. Following that, the entrance of college will move to the southern part, near the bus stop.
Inside of college building will undergo significant developments. Initially, two more classrooms will be added and the library and rececption room will replaced. What’s more, rececption room will get smaller and stay in the center of the building, while library switch it side to the left. Next, new shopping store will add inside of the building near the lunch area, and toilet will move to the end of the hall, between the shop and classroom.
Word Count: 166