The diagrams provided illustrate the differences between current college and its modifications in 2020. It is clear that there are additions of carpark space, toilet,classroom, and shop. Additionally, some buildings will convert into classroom.
Upon the closer examination, the entrance location will be redevelop from the north near foothpath to the south right after bus stop. The first building we will find from the illustration plan in 2020 is library on the left side and classroom on the right side, which will swap it’s function from current building. Move forward, there is a new small reception building between two classrooms that one of them we can not see now since they do not convert the reception building into classroom yet. Additionally, the classroom and shop building will be construct, while lunch area remain the same.
Unfortunately, Visitor can not walk over footpath in to garden area because these will be demolished. However, the carpark will be nore spacious since they plan to enlarge this area.
