The provided diagrams depict the evolution of a school site from 2004 to 2014, showcasing significant changes in infrastructure and student capacity.
Overall, the transformations included the construction of a new school building, expansion of parking facilities, and the addition of a connecting road. The student population surged from 600 in 2004 to 1,000 in 2014.
In 2004, the school site consisted of two main buildings, School Building 1 and School Building 2, alongside a sports field and a single car park adjoining a main road. A singular path connected the structures and led to the parking area. By 2014, a third building, School Building 3, replaced the sports field on the East side of the site. Furthermore, a new path was introduced to connect this new building to the main road, while the existing sports field remained unchanged.
Moreover, the transformation in the parking layout was evident. In 2004, there was only one parking lot in front of the main entrance. However, by 2014, a second parking area was added to the East of the school, connected by a newly constructed road. This road linked the original parking lot with the new one, which was positioned adjacent to the park.
