🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The map below shows the development of the museum between 2010 and 2013

Image for topic: The map below shows the development of the museum between 2010 and 2013
Our system will evaluate the answer based on this AI-generated description.
The image displays two museum layouts for 2010 and 2013. In 2010, the museum comprised an Entrance, Lobby, Ticket desk, Dinosaurs hall, Mammals hall, Ocean Hall, and a Garden containing 4 trees. By 2013, the layout featured the same Entrance, Lobby, Ticket desk, Dinosaurs hall, and Ocean Hall; the previous Mammals hall was replaced by two new halls, Ice age and Insects, while the Garden area was repurposed to include a Shop, a Cafe, a relocated Mammals hall, and a Human Origins Display within the Mammals hall.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagrams illustrate the changes made to a museum from 2010 to 2013. Overall, the museum underwent significant expansions and modernization over the three-year period. While the ocean hall, lobby, entrance, ticket desk, dinosaurs remained largely unchanged, several new exhibition areas, and visitor facilities were added.

In 2010, the museum consisted of two main exhibition rooms located on the left-hand side: the mammal section positioned at the top and the dinosaur gallery below it. On the right-hand side ocean hall was situated, which was connected to a central lobby leading to the entrance and ticket desk at the bottom. To the east of the main building, there was a green area.

By 2013, substantial alterations had been made. The former mammal exhibition on the upper left was replaced by a new ice age gallery while a smaller insect section was introduced between the ice age and dinosaurs. The ocean hall, lobby, entrance and ticket desk retained their original position but their size was expanded a bit. However, the most dramatic transformation occurred on the right-hand side on the museum. The garden was removed to make space for an expanded indoor area that included a relocated mammal section, a human origins display, as well as newly constructed visitor amenities such as a shop and a café.

In summary, the museum evolved from traditional exhibition into a more customers oriented facility equipped with modern amenities.

Word Count: 233

Answers On The Same Topic:

The map below shows the development of the museum between 2010 and 2013

The map illustrates the changing of several museum’s improvements from the period 2010 to 2013. Overall, the area of museum has been enlarged, although the garden area has been replaced with the buildings. In 2010, the museum was divided into greeny area, which was known as garden area. In this area, there were many plants […]

The map below shows the development of the museum between 2010 and 2013

The map given illustrates the transformation of the museum during 2010 and 2013. Overall, the layout of the place has changed significantly and expanded throughout the years. Certain places has been reloacted and modern, more historical categories were introduced. In early 2010, the institution had a garden on its right side , while inside the […]

The map below shows the development of the museum between 2010 and 2013

The devlopment of the museum between 2010 and 2013 has many changes in just 3 years. At first in 2010 it has only 4 main sections which include Lobby, Dinosaurs Zone, Mammals Zone and Ocean hall which visitors can see this zone first after they walked past the lobby. Furthermore, in 2010 the museum still […]

The map below shows the development of the museum between 2010 and 2013

The provided map illustrates the evolution of a museum’s layout from 2010 to 2013. Overall, the transformation reflects significant enhancements and the introduction of new exhibition areas, catering to a broader audience. In 2010, the museum’s layout comprised several key areas including an Entrance, Lobby, Ticket Desk, Dinosaurs Hall, Mammals Hall, and Ocean Hall, alongside […]

See All

Other Topics:

The maps below show the changes that have taken place at Westfield Airport between 1980 and the present day.

The maps illustrate the changes that have taken place at Westfield Airport between 1980 and the present day. Overall, the airport has become more modren and expeanded. In 1980, Westfield Airport had just one terminal and shops and restaurants in the center. Below them, there was a covered walkway, and a car park below it. […]

The map given below shows the plan for reconstruction of the second floor of Mason's Building. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps compare the current layout of the secord floor of Mason’s building and its proposed redevelopment plan. Overall, the floor will be exstensily redesigned from a residential area into a studio. The bathroom and landing will remain unchanges, while all the reamain rooms will be transformed. The kitchen and bedroom 3 will be converted […]

The diagrams below show the plan of a small school in 1980 and in 2010.

The map illustrates the reconstruction of a university department in 1980 and 2010. Overall, it can be seen that the main changes in the size of a university, also some changes in the outside. The university was expanded, instead of three seminar rooms, in 2010 there is five seminar rooms. So, the coridor turned longer […]

The two maps below show an island, before and after the construction of some tourist facilities. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the developments that took place on the island. Overall, the major changes took place in the central and western parts of the island, while the eastern side remained unchanged, with the appearance of various tourism facilities. Regarding the map of the original island, the landscape had a length recorded at around 230 […]

The maps give information about the village of Stokeford in 1930 and 2010. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The two maps illustrate how the village of Stokeford changed over an 80-year period from 1930 to 2010. Overall, the village underwent significant redevelopment, with many original features being removed or replaced. More residential and recreational facilities were added, including retirement homes and new housing, while the post office and the bridge remained unchanged. In […]

The maps below show the village of Stokeford in 1930 and in 2010. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The given two maps illustrate how the village of Stokeford changed over an 80 years period from 1930 to 2010. Overall, the village has undergone significant redevelopment, with many original places being removed or replaced. Recreational and more residential facilities have been added, including retirement homes, houses, while the Post office and bridge remain unchanged. […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.