The two maps illustates the arrangement of a school in 2013 and the proposed on in 2016.
Overall, the school site underwent significant changes over the 3 years period. New areas introduced, one section moved and enlarged, while some parts remained unchanged.
According to layout of 2013, the school had 600 students, and consisted of 2 buildings. Building 1 was located in the north, whereas building 2 was situated in the south. There was a playground in the east, while car park was located in the west side of layout.
Looking at arrangement of 2016, the school size enlarged, and had 1000 students. Building 3 was constructed to east side of the building 1, and also a path added between the building 1 and the building 2. The playground moved to south side of layout and also enlarged a bit. New car park was intoduced to east side, and a road was added between car parks.
