The two maps illustrate how a college campus changed in the development over a decade from 2005 to 2015.
Overall, the campus remained similar structures in these years, however the types of facilities became more diverse in 2015.
In the top-west corner of the plan, one of the school buildings which located in the top was replaced by a parking lot in 2015, while there were three located in 2005. In addition, a clinic was newly bulit right below the school buildings. On the other hand, a library and a dining hall were constructed in the south-east corner in 2005 whereas the parking lot was originally placed. To be noticed, the area of dining hall became larger in 2015. Furthermore, a dining hall had been changed to a student center in 2015.
In contrast, the location and development of some constructions remain unchanged, including the playground, office building, stadium and the two lower school buildings near the stadium in 2005.
