The given illustrative diagram compares the development of a college campus over a period of 10 years, from 2005 to 2015. Over the time period, the campus introduced 3 new infrastructures, namely the clinic, library, and student center.
It is evident, that over time, the number of school buildings decreased from 3 in 2005, to only 2 in 2015 to make space for a clinic. Similarly, the parking lot was demolished to make space for a library and the reconfigurated, larger, dining hall. A new student center was established at the previous location of the dining hall. The parking lot was then reconstructed at a later date at a different location on the campus. As a consequence of this relocation, the size of the stadium was reduced to accommodate the parking lot.
Some similarities, however, still remain such as the playground, office building, and both of the school buildings, all of which managed to retain their location and size in this time frame.
