The maps illustrate the current layout of an office building and the proposed changes after redevelopment. Overall, the redesign involves the removal of certain areas, such as the kitchen and canteen, and the introduction of new facilities, including an outdoor seating area, a coffee machine, and a meeting area.
In the west wing of the current building, the grass area on the left will be replaced by an outdoor seating area with chairs. The entrance to the building in this area remains unchanged. Moving towards the center, the kitchen and canteen will be removed entirely, and their spaces will be converted into two additional offices, resulting in four office rooms in the central corridor instead of two.
In the eastern wing, the storeroom and WCs remain unchanged in both layouts. However, a coffee machine will be installed near the storeroom, enhancing the functionality of this section. Additionally, in the southeast corner, a new meeting area furnished with chairs will replace the previous grass area. Meanwhile, the central entrance in this part of the building remains the same, maintaining accessibility.
