The maps above serve a current industrial area in the town of Norbition, and an upcoming future development. Generally, we can see that are lot’s of differences and more renovations happening in the long term.
In the roundabout, the current infrastructure only have 2 streets. And along one of the streets has four factories on the sides and one factory at the end of the stree, making it five in total. Whereas the other street leads to the long way. It is a huge contract with the long term renovation. In the planned renovation, we can see the roundabout will have 2 more streets than the current one. The first street, who have 5 factories in the current moment, will be renovate to 3 factories on the side, and a school at the end of the streets. The second street, who leads to a long way in the current moment, will be leading to another roundabout in the future. The third street will have 2 new factories, one at the side and one at the end of the street. And the fourth street will be build over a river and has the largest factory and the end of it.
The other differences that we can see is more infrastructure will be build in the future. In the status quo, Norbition only have 8 factories (which is slightly greater than the future plan who only have 7 factories ) while the future one have more various public infrastructure, like shops, medical centre, playground, and last but not least school.
