
Our system will evaluate the answer based on this AI-generated description.
The image contains two maps of an industrial area in the town of Norbiton, showing the current layout and planned future development. The first map depicts the area as it is now, with a river running horizontally across the top, farmland to the north of the river, and a main road labeled as "Town | | Sea" running vertically down the middle. To the east of the road, there are five rectangular industrial buildings arranged in a row, and to the west of the road, there is a larger, circular building labeled as "Factory." In the second map, the future development plan shows the river and farmland in the same positions, but the industrial buildings have been replaced by a circular arrangement of five buildings around a central roundabout, with an additional building to the east. The factory remains in the same location, but there is now a "Playground" to its west, and a residential area labeled as "Housing" has been added to the southwest corner of the map. The road labeled "Town | | Sea" is still present, but it now curves around the new building arrangement.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The two pictures compare the current layout of an industrial area in Norbiton town and its future plan development.
Overall, it can be seen clearly that the factories in the current plan will be demolished and the housing will be constructed in the area. Also, it is planned to construct a bridge over the river to reach the housing on the other side of the river near the farmland.
In the right side of the main square, it is planned to construct various sections and buildings, particularly playground, school, and medical center. The factories in this area will be replaced by houses. Also, there will be a small square to the south of the main square. Moreover, the shops will be constructed in the southwest of the current main square.
In the future plan for the development of Norbiton industrial area, two streets will be built, one to the other side of the river and another one to the northwest of the plan, which can help people to reach the houses. Also, there will be a bridge and street toward the north of the plan, which can be used to reach the new housing and the farmland.
Word Count: 197