The diagrams illustrate the layout of a school site in 2004 and the planned changes for 2024.
Overall, the school is expected to expand significantly to accommodate a larger number of students, increasing from 600 to 1,000. The main changes include the construction of a new school building, additional car parks, and the replacement of the sports field with more facilities.
In 2004, the school consisted of two buildings. School Building 1 was located near the entrance and car park on the left side, while School Building 2 was situated behind it. A sports field occupied the right side of the site. There was a single car park to the west of the entrance, and a large area of trees in the southern part of the site. A path connected the two school buildings.
By 2024, several developments will have taken place. A new building, School Building 3, will be constructed to the east of School Building 1. The sports field will be reduced in size and moved slightly to the southeast. Additionally, a second car park will be added on the eastern side of the school. A road will replace the former path, running between the buildings. Despite these changes, the original entrance and the main layout of the site will remain largely the same.