The two maps demonstrate some changes between an industrial place in Norbiton in nowadays and plans for upcoming development in this area.
Overall, it is conspicuous that several changes will be made to the certain area, including the addition of accommodations and different types of facilities, instead of the demolished factories.
It would worth mentioning that all of the factories throughout the roundabout and the mid-western part of the Farmland in the north of the river will be removed and it will be replaced with housing sites. Moreover, the roads will be constracted along the sites, above the river and west part of the roundabout. There will be some residences and playground in the north of the roundabout.
Another roundabout will be built in the south of the enormous one, and above the new road circle, shops and medical centre will be developed, and a school will be built parallel to the massive road circle.
