The two pictures compare the current layout of the floor of the office building which is in a particular government, and with a plan to redesign the same space.
We can see that the new design proposal involves making a number of changes to the ground floor of the building. There are no plans to change stock room.
At present, the office building has the grass areas on both sides. However, the future development is to change the left side to the outdoor seating area and the grass area on the right side will separate to a meeting room, which will include WCs and a coffee machine.
The four offices in the redeveloped building will on different sides, while the kitchen and the canteen are replaced by two offices out of four which are beside stock room. Finally, the entrance to the reception will be in the middle of the other two offices.
