The floor plans illustrate an office building at present and planned renovation.
Overall, the building will undergo a number of significant changes,the most important which are the movement of grass to make way for employee amenities, and the development of some features.
On the left side of the building, the entrance to the grass will remain, while the grass will be replaced by an outdoor seating area at the top and 3 chairs at the bottom. In the main building, the main entrance is on the right side, but it is planned to relocated to the center. 4 small offices adjacent to the main entrance are projected to be changed into 2 large office on each side of the entrance. Two other large offices will be built in the top left corner, replacing the current kitchen on the left and the canteen on the right.
On the right side of the building, the grass is planned to be demolished to make room for coffee machine at the top and meeting area with 2 chairs at the bottom. No changes will be made to the storeroom on the right side the grass, while the toilet below it is projected to be repositioned to the top right of the building.
