The maps illustrate the changes in the layout of a seaside resort over a 35-year period, from 1990 to 2005. Overall, the seaside resort experienced a significant development over the 30 years. The most noticeable change is the replacement of many green areas with several major infrastructure projects.
To begin, there were several major changes in the western part of the resort. One of the key changes was, instead of green areas, there were built many buildings, existed in 2005. For instance, in the middle of west side, there was open space area with some trees. Over 15 years, there was constructed four buildings, and below these buildings was built a huge supermarket. Additionally, in 1990, large green area with many small houses, replaced one three multistory buildings. Moreover, the same one building was constructed beside the small river that stayed unchanged.
On the other hand, the eastern part of the seaside resort shows lower level of development than the western side. One of the key changes was building factory over 15 years and below, railway station was built ferry. In addition, behind hospital was constructed three single-family based homes instead of one three and home. Moreover, in the left of school was flown airplane that existed in 2005.
