The given plans illustrate a porth harbour in 2000 and its present view after modifications.
Overall, multiple Changes harbour are made to porth harbour now. Some points are maintained on their original position, where they were in 2010.
A main road is passing along the west side of harbour, with a branched road towards east Side. A car park was connected with main road with adjacent area designated for showers and toilets. In addition, another car park and adjacent area for showers and toilets is built and also connected with main road. Moreover a car park was present on the start of branched road, which is now removed.
The areas designated for Marina and fishing boats in 2000 are now exchanged with each other. Furthermore, the public beach present on north side is maintained while southern side public beach is now converted into a private beach for hotel. Also, the castle in South east corner is transformed into a hotel. Similarly, dock is transformed into place for boat. Some points like passenger ferries and life boat are maintained on their original position.
Lastly, cafes and shops are established between marina and lifeboat now.
