The picture compares the transformation layout of a theater between 2010 and 2012.
Overall, major changes include the expansion of both top and bottom of the theater to accomodation more space. Several convenient activities had been added to diver the options inside the theater.
In 2010, stepped into the main door was the cafe shop located in right side, following by the two offices, particularly admin office and ticket office, stayed in the left side of the main door. Stepped into the seat area, there were a stage and dressing room in front of them. An exit door connected dressing room with the storage laid off at the left side.
Two years later, there were an expensions at the bottom of the theater and the alternate of other advanced activies. Specifically, both offices on the left hand of the main door transformed into a wide restaurant, which was facing a brand new admin office. Meanwhile, the cafe shop was replaced for ticket office. Through seating area, the stage were divided into two parts, which were a smaller stage and a corridor. Dressing room was no longer stayed in the old position, it moved to the left side altered the storage and upgraded with a shower room in front. Thus, the storage was moved to the right corner of stage area.
For 2 years, the theater witnessed a numerous tranformations which were a significant changes in accomodations.
