The supplied plans detail the transformation of a small theatre between 2010 and 2012.
Overall, the redevelopment involved a significant relocation of existing amenities, including administrative and ticketing functions, dressing rooms, and storage. Concurrently, new facilities, notably a shower room and restaurant, were introduced, while the stage area was substantially enlarged.
Initially, in 2010, an administrative office and a ticket booth were situated adjacently to the left of the main entrance. By 2012, the ticket booth had been repositioned to the right of the entrance, occupying the space previously allocated to a cafe. Conversely, a new restaurant was constructed to the left of the entrance. While the auditorium itself remained structurally unchanged, the administrative office was reassigned to the right flank of the auditorium. Furthermore, a new access point was created on the upper right side of the auditorium.
Concerning the remaining areas, the original dressing room was located directly behind the stage, with storage facilities to the stage’s left. In 2012, however, the dressing room was relocated to the former storage space, which was, in turn, expanded to incorporate new shower facilities. A connecting corridor was then established, linking the dressing room to a storage area positioned in the upper right quadrant of the theatre. Notably, the footprint of the corridor was smaller in the later plan, thereby augmenting the overall stage dimensions.
