The maps illustrate the layout of a theatre in 2010 and 2012. Overall, the area undergone significant changes, with new facilities and improvements added. Notably, only the auditorium and main doors remained unchanged.
In 2010, a café was located in the bottom right corner, with a seating area surrounding it. Opposite this, there were ticket and admin offices where visitors could purchase tickets. Heading south, the auditorium was situated in the center of the theatre and was surrounded by numerous seating areas. At the top, there was a stage and a dressing room, while a storage room was located to the left of these areas.
By 2012, several changes had been made. A new restaurant had been constructed to the left of the main door, resulting in the relocation of the admin and ticket offices. The admin office was moved closer to the auditorium, and the café area made room for the ticket office. The stage was expanded, and a narrow corridor was built at the top of the theatre. Additionally, the storage room was relocated to the northwest side of the theatre, creating space for the dressing room and new shower facilities
