Our system will evaluate the answer based on this AI-generated description.
The image exhibits two layout plans labeled "SOUTHWEST AIRPORT," one captioned "NOW" and the other "AFTER DEVELOPMENT." The current layout displays a building with seven sections: security (1), passport control (2), customs (3), check-in (4), café (5), walkways (6), and gates (7). The future development indicates an expansion to eighteen sections with added features: bag drop (8), ATM (9), sky train (10), car hire (11), check-in (12), café (13), security (14), passport control (15), customs (16), walkways (17), and gates (18). The bottom of the image provides a legend correlating symbols to their respective services like check-in desks, bag drop, café, ATM, sky train, car hire, walkways, and gates.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The assigned maps demonstrate how the South – West airport has developed after redevelopment. It is clearly to see that the facilites of this airport has gone Into massive changes in terms some gates, space occupied by airport and like other.
we can see, The departure area was modified to have a bag drop service, along with a cafe and check in module that were already there before the renewal. There are now 18 gates, which were 8 before the redevelopment.
A Check in was sifted to right of the departures, and Bag drop is substitute at this space and cafe is replace of the buttom of departures on left side. the walkway Installed between the gates has been replaced for a skytrain, which will be able to transport people along the different gates. The area of arrivals was empty before rebuilt, but now it has an ATM, a cafe and a car hire service that will glady you to your destination . Also, the size of this airport become very large Sized after refurbishment.
Word Count: 175