Our system will evaluate the answer based on this AI-generated description.
The image shows two diagrams labeled "Southwest Airport" with "Now" and "After Development" plans. The "Now" diagram features a central airport control with six elements (gates 1-5, car park) surrounding it, labeled in clockwise order from the top left [car park, gates 1 and 2, gates 3 and 4, passport control and security, gate 5]. The "After Development" diagram shows the same central control but with fifteen elements, including additional facilities (gates 6-15, car park, check-in area, railway, bus station, car hire). The arrangement of elements differs, with the additional facilities appearing between the original ones, except for the bus station and railway that are placed together opposite security and passport control. No numerical data/percentages are visible.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The provided plans presents the renovation of an airport in next year.
Overall, the gets of airport will totally expand and there will be verity of customers facilities added including bag drop, ATM, sky train and car hire.
The location of departures and arrivals remain same but there are plans to add some doors. Upon entering the airport, there is single cafe and check-in. The future plan project moving the check-in from left to right side in order to make room far bag drop area and the repositioning of the cafe.
Security, passport, control, and customs will be unchanged, however the future floor plan shows shop immediately upon exiting the security section for departures.
Word Count: 114