The map provide a detailed illustration of how southwest airport will be redeveloped and transformed next year. There will be extended buildings right in the walkway area, reallocated, and added up some facilities that shown in project map.
There used to be 8 points in walkway area that will be extended into 18 points and replaced with sky train. The extended building will be created into two different paths. In addition, there will be a lot of new facilities built up such as bag drop, café, ATM, sky train, and car hire. Also, there will be an expansion of the area in the arrival section.
In the departures area, bag drop will be the new facility that built up, just right across the check-in area. Afterwards, there will be shops area after passing the security passport control and before the sky train area. The walkway area will be replaced by a sky train due to expansion of the path or building. Then, in a arrivals area, after passing through passport control customs, new facilities will be set up on the left side, including a café, ATM, and car rental. Furthermore, arrivals will be able to find the car rental area that will be built directly to the left of arrivals exit.
