The given maps demonstrate the current layout of an airport and how it will look after future renovation plans next year. Overall, after the reconstruction, the airport site will be expanded, and additional facilities will be introduced, including a bag drop, an ATM, and a sky train.
The current layout shows two separate entrances for departures and arrivals. In the departures area, the check-in counter is situated in the corner, while a cafe is located opposite it. In the arrival area, there are no facilities for travelers. After entering the departure area, passengers first go through the security checkpoint, followed by passport control. On the arrival side, travelers pass through passport control and then proceed to the customs area. After passing security and passport control, passengers proceed along a walkway equipped with moving walkways, which leads directly to the boarding gates (4 to 8).
After the reconstruction, the facilities will be enlarged and become more convenient. In the departures area, the check-in counter will be transferred to where the cafe is located, in the left corner, and a bag drop will be built in the right corner. In the arrival area, a cafe and an ATM will be built in the top-right corner. Additionally, the car hire service will be positioned slightly outside the main building outline. The walkway will be replaced by a sky train. After passing through the sky train, the passage diverges into two separate corridors, with the left one leading to gates 6 to 9 and the right one providing access to gates 10 to 14.
