.These two maps indicate the differences of Pancha village’s scenery and architectures between 2005 and 2015. Overall, there were some adjustments in construction although the main arrangements in constructions are retained.
Facing the main road, there were some inhabitants’ houses which almost used the antennas in 2005, and they were demolished some constructions , as well as modified form antennas to satellites systems in some houses in 2015. In the right corner of the map, there were two pagodas in 2005, before constructing one more in the free space in 2015.
The low-quality road which contained many holes had been upgraded to be more modern and ready for transportations, as well as adding the telecommunication towers built paralleling this road. There was also the changing of markets, which had 5 buildings and confusedly construction, to the linear design as well as adding 3 more in 2015. The last remarkable change is to the school: Before it was two edifications of primary level, but in 2015, these two building were divided equally by transforming to a primary and a secondary school building.
