🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: Two maps indicate current and future development of the city

Image for topic: Two maps indicate current and future development of the city
Our system will evaluate the answer based on this AI-generated description.
The image displays two maps of Islip town center; the current map shows a main road running east-west through the town center with shops directly north and south of it, countryside beyond the northern shops, a curved road branching south to housing and a school, and a park to the farther southeast. The planned development map shows a dual carriageway enclosing the town center with a shopping centre, bus station, and car park centrally located south of the main road; a pedestrian-only section of the road in front of these facilities; new housing is added northeast and south of the park and existing housing, while the park remains, and the school stays in its previous location.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps illustrate the current layout of Islip town center and the proposed developments planned for the future. Overall, the area is expected to undergo extensive modernisation, with major additions to transportation and urban facilities, while some existing structures will be redesigned.

Currently, the central area of the town contains a row of shops on both sides of the main road, however, in the future, the main road here will be converted into a pedestrian path while shops on the northern side of pedestrian path are planned to be demolished and replaced by a large shopping center. Despite the straight main road, a dual carriageway will be built that will encircle the town. Along the northern section of the road, a bus station, a car park, a shopping mall and a new housing area are planned to be constructed, replacing the current countryside.

In the south, the area currently occupied by the housing areas will be divided into two sections after expected construction of the highway. A park is the biggest amenity in the town centre, however, turning to future developments, its territory will be decreased in size to make space for the new road. The school which is located in the south-west of the town will be slightly modified and the southern row of shops will remain.

Word Count: 219

Answers On The Same Topic:

Two maps indicate current and future development of the city

The given maps provide information about the layout and the plans for development in Islip town centre. Over the plan, it can be see that the developers extend the roads to better connect the town’s areas at the expense of its rural economics. Alongside this, the houses will build and the shops will be replaced […]

Two maps indicate current and future development of the city

The given maps provide the information of how the Islip town centre looks like currently and its future development. Overall, the centre of the town will be enlarged in size together with new housing and facilities that will be constructed. First of the all, the city will be expanded by taking the current countryside area […]

See All

Other Topics:

The maps compare a present layout of the college and future developments to it

The picture compares to conditions of a layout in the present to those of future. Overall, the place will have underwent significant improvements in public facilities, especially in labaratory area. Of particular note, a cafe, library, sports hall, and computer room. In the present layout, there were administrative offices in the northwestern corner next to […]

The maps below show the changes that have taken place at Westfield Airport between 1980 and the present day.

The maps compare Westfield Airport in 1980 and the present day, illustrating the changes. Overall, the most noticeable feature is the increase in the number and size of the main facilities. Accessibility has also been improved, as shown by the growth in the number of roads and modes of transportation. The location of the main […]

The maps below show changes in a rural area between 1970 and 2010.

The two given maps illustrate the transformations that took place in a rural area over a period of nearly six decades from 1970 to 2010. What is most striking when looking at the maps is that the rural region witnessed substantial modifications, with the most notable being the addition of residential, sports, and industrial amenities, […]

The plans below show a public park (Grange Park) when it first opened in 1920 and the same park today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two plans illustrate how the public park has changed since 1920. Overall, the grange park has undergone significant redevelopment. While some original features such as rose garden and entrances remain, many areas have been modernized, including the addition of new facilities like café, children’s park and a underground car park. The grange park was […]

The plans below show a public park (Grange Park) when it first opened in 1920 and the same park today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two plans illustrate how the public park has changed since 1920. Overall, the grande park has undergone significant redevelopment. While some original features such as rose garden and entrances remain, many areas have been modernized, including the addition of new facilities like café, children’s park and a underground park. The grande park was opened […]

The Maps show construction between 2007 and 2012 in Stratford in preparation for the 2012 London Olympic Games.

The photo illustrate construction preparation for the 2012 London Olympic Games around 2007 and 2012 Overall,the city has significant modernization .South side of the city was totally removed and huge changes appeard.It also applies to the northen part ,there is new three construction specially desined for olympic In the south side of map ,new feature […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.