The two picture compare the development of the island before and after the construction is completed, it propose some facilities for tourists
It is obvious that the island will be transformed, with most of the changes that the island space will be filled. There will have many huts and two big building, and also have some convinient conditions for toutist.
Two begin with, prior to the development, the island is very empty. It was certainly a deserted island with some trees and the beach. However, the plan is to construct many huts on the layout of the island for the accommodation. Furthermore, the restaurant and the reception will be built to satisfy the tourist.
In addition, it already has a beach on the island, and it will become a beach for swimming after the construction. Moreover, the pier will be added, which is very important for the tourism. Another important changes that the foot-path will be constructed in accommodation area, and vehicle track will be built around the reception and straight to the restaurant.
