The given diagram illustrates the process of storage room construction, applying concrete canvas.
Overall, there are eight main steps in creating the storage. First, the material is dismantled, then delivered and decomposed on the bottom, and finally, watered and set.
Initially, there is a creation process, including three materials: fibrous top surface, dry concrete, and waterproof layer. Then they merge into each other before the output is delivered and unpacked. Consequently, the latter is spread on the ground along ten metres, being covered by the rope and set by pegs.
Next, there is a step of pumping air, which happens underground. An air pump machine smoothes the provided substance toward the door. After that, an employee waters the room, particularly eight metres in height, before the final step—setting, which lasts from 20 to 24 hours. The storage room is ready if all the steps are done successfully.