The given diagram gives information about how to construct a storage area using concrete canvas.
Overall, it is evident that the process consists of eight main stages, beginning with the manufacture of canvas and ending with ready-to-use storage room.
Initially, a base of waterproof plastic, a middle layer of dry concrete fibre, and a top layer allowing water to pass through, are combined together to form a canvas. After that, the composite is packaged with concrete canvas before delivering to construction site. After transporting to the site, the composite of 1 meter wide is unwrapped, removed the cover. After which, it is unfolded, using pegs and rope tying up to a vehicle to stretch it out to a length of ten meters.
The fifth step is inflating the canvas using a pump to flow air, this stage finish when the concrete canvas reaches 2.5 meters height. Then, it is hydrated with water and left to set for a period between 20 and 24 hours. Eventually, the linear procedure concludes with a fine storage room ready for immidiate use.