🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: the plan below show a harbour in 2000 and how it looks like

Image for topic: the plan below show a harbour in 2000 and how it looks like
Our system will evaluate the answer based on this AI-generated description.
The image shows two plans of Porth Harbour, one from 2000 and one from today; in 2000, the harbour included a car park, fishing market, toilets, road, path, public parking, dock, marine office, fishing boats, sailboats, lifeboat, passenger terminal, Hotel (Café); in the today plan, the marine office and passenger terminal remain while new additions include sailing club replacing showers, new restaurants replacing fishing market and public parking, fishing market gains adjacent cafe & shops area, sailboats and fishing boats area revamped with a new area allocated for leisure fishing, castle remains unchanged.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagram shows the current layout of Porth harbor compared to how it looked in 2000.

Overall, there have been some major changes, such as turning the old castle into a hotel and adding a new dock. However, some parts have stayed the same, like the private beach, the passenger ferries, the main road, the lifeboat station, the showers and toilets, and the public beach.

In 2000, the harbor had several important areas. In the north-south part, there were showers, toilets, a marina for private yachts, and a car park. In the northeast, there was a dock, and just above it was the public beach. The main road was on the west side and connected to the car park, fishing boats, and the lifeboat station. The public beach and the old castle were in the southeast, and the passenger ferries were near the dock. The main road also connected to the car park.

Today, there have been many changes. The marina for private yachts has been replaced by an area for fishing boats. A new road has been built, branching off from the main road. New showers and toilets have been added near the car park and marina. A café and some shops have been built between the lifeboat station and the marina. The car park has also been slightly changed, and a new road now connects it to the main road.

Word Count: 232

Answers On The Same Topic:

the plan below show a harbour in 2000 and how it looks like

Both graphics demonstrate a dockyard plan in 2000 and the present. The harbour is located on the east side of the main road and has two entrances to the harbour in 2000. Over the period, the harbour was completely transformed with the addition of a shower & toilet, cafes, shops and a dock. Castle had […]

the plan below show a harbour in 2000 and how it looks like

The plan illustrates today’s appearance of harbor and previous bank in 2000. Overall big alterations are disused castle becomes hotel, one dock was multiplied to another one. Which areas remained same; private beach, passenger ferries main road, lifeboat , showers and toilets , and public beach. In 2000 the Porth harbor had a number of […]

See All

Other Topics:

The plans below show the layout of the fround floor of a museum in 1990 and in 2010

The plans illustrates the layot of museum ground floor in 1990 and 2010. Overall, the layout show seven main changes concerning. The first map which was made in 1990 had only gift shop while, the second map made in 2010 had gift shop and cafe. Between gift shop and natural history room in 1990 hadn’t […]

The plans below show findings at an archaeological site in 1890 and 1990.

The plans illustrate findings at an archaeological site in the period from 1890 and 1900. As an overall trend, the green areas were dramatically decreased. Furthermore, there were significant changes in main features over the period given. In 1890, the green area were almost third the total area of the site. While, archaeological site had […]

the plans below show a small theatre in 2010,and the same theatre in 2012

The diagrams illustrate how the layout of a small theatre was redeveloped between 2010 and 2012. Overall, the theatre underwent considerable changes, with several existing facilities being relocated, replaced or converted into new ones. However, the main entrance and the auditorium remained largely in their original positions. In 2010, visitors entered the building through the […]

The two maps illustrate developments in the Lakeside area between the years 2000 and 2009

Two maps depict the evolution of the Lakeside area over a nine-year period, from 2000 to 2009. Overall, the Lakeside area underwent substantial development, with several existing areas being removed and expanded, and a number of new facilities being added. Also, it was notable that the lake was reduced in size and eventually becoming a […]

The maps below show an island in 2005 and 2020. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the differences of an island in two different years -2005 and 2020. Overally, many developments took place as the years cross by from 2005 to 2020. Many infrastructures have constructed in the island in 2020. From the chart, it can be seen clearly that in 2005, the island was entirely occupied by […]

The map below shows the development of a seaside village between 1995 and present.

The plan illustrates how the village of Ryemouth has changed from 1995 to the present time. Overall, this area has experienced significant gentrifications to accommodate more residents partly through providing more entertaining facilities and public spaces. In the land, the farmland, which previously located in the at the right corner of the town, has been […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Buy activation codes in bulk and give one to each learner. A code does not expire until it is used, and each subscription only starts counting once its code is entered, so you can buy now and hand them out later.

10+ codes: 10% off 25+ codes: 15% off 50+ codes: 20% off
The codes are emailed to your payment address as soon as the payment goes through, and are also shown on the confirmation page. A tax invoice is issued automatically at checkout — select Purchasing as a business there to put your organization's name and tax ID on it.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.