🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

Image for topic: The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two layout plans: "5 years ago" and "Current plan." In "5 years ago," the layout includes Bookshelves, Studying tables, Desk for computers, Classroom, Meeting room, Borrowing and returning desk, and Library office. In "Current plan," the layout shows Bookshelves, Private studying tables, Desk for students' laptops, Recording studio, Meeting room, Borrowing, Returning, and Conference room.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate how a school library has changed after 5 years.

Overall, major changes include the addition of tables for studying, the recording room, the desk for students’ laptops, and the conference room. These changes have come at the expense of the classroom, one bookshelf, and the library office, turning the library more convenient than before.

Five years ago, the library had basic infrastructure. In the southwest of the library, there was a series of adjacent rooms, with the meeting room in the middle, together with the classroom and the borrowing-desk returning room on either side. In the center of the library, where students can study with four tables, which is situated among two bookshelves. In the top right-hand corner was the desk for computers, which was next to the library office.

Currently, the library has been retrofitted more adequately and modernly. In the left-hand corner, the Classroom has been replaced by the Recording studio, along with Borrowing and Returning room has been partitioned into two separate rooms, increasing one room to the previous. The previous study tables have been updated with two tables, resulting in a total of 6 tables. A bookshelf at the bottom of the library has been substituted for a new desk for students’ laptops. The library office has been converted into a conference room. Although there have been many changes, a bookshelf on the top center, the desk for computers in the right-hand corner, and the meeting room have remained unchanged.

Word Count: 247

Answers On The Same Topic:

The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The diagram compares the past layout of a particular school library five years ago with its current floor plan. Overall, the school library has undergone significant changes, the most noticable among which is the introduction of desks for students’ laptops, recording studio and conference room at the expense of book shelves, classroom, library office and […]

The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The plans compare the layout of a school library as it was five years ago with its current arrangement. Overall, the library has been extensively reconfigured, with two notable developments: the introduction of dedicated private-study pods and additional laptop workstations replacing general-purpose spaces, and the repurposing of service rooms (for example, the classroom and office […]

The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The two given maps demonstrate the proposed changes of a school library’s layout in a 5-year period until now. In general, it is apparent that the design has been dramatically developed, with the most innovation being the addition of more new facilities acompanied by the renovation of educational areas. On the left side of the […]

The plans show a school library 5 years ago and the same library now. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The plan provides information about the change of library 5 years ago and it’s in now. Overall, it is clear that the library witnessed a significant modernization in the current plan. Most noticeably, the library cafe was utilized by the council. Beside that, the replacement of classroom for the recording studio and area of borrowing […]

See All

Other Topics:

The two maps below show a housing estate now,and how it will look after redevelopment

The two maps compare housing estate condition present and future position after plans of reconstruction. Overall, it is evident from maps that there will be significnt development. The main change is in north side and one, two, three- bedroom houses resulting the dissapearence of four-bedroom houses. More detailed, at the present this place is residental […]

The maps show the changes of a small village from 1995 to present. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate how a small village changed between 1995 and the present, focusing on alterations in its layout and facilities. Overall, the village has undergone considerable development, with farmland and natural areas being replaced by recreational facilities and residential buildings. In addition, commercial amenities have been upgraded to accommodate increased activity. In 1995, the […]

the plans below show the South Wing of Walton Museum in 2008 and 2012 after it was redeveloped. summarise the information by selecting and reporting the main features, and make comparison where relevant.

The plans illustrate how the layout of South Wing of Walton Museum changed from 2008 to 2012. Overall the part of the museum experienced significant transformation over the period, with introduction of new fasilities and rearangement of old blocks. The final development of the museum generally became more welcoming and toursit-frendly. In 2008, the site […]

The map below is of the town of Garlsdon. A new supermarket (S) is planned for the town. The map shows two possible sites for the supermarker. Summarise the information by selecting and reporting the main features, and make comparisons where relerant.

The map illustrates two potential locations (S1 and S2) for a new supermarket in the town of Garlsdon, which has a population of 65,000. Overall, the two sites differ significantly in terms of their surroundings and accessibility. S1 is situated in a rural area outside the main town, while S2 is located in the central […]

The two plans below show the City Library in 2004 and 2014.

The maps show differences in a city library structure between 2004 and 2014. Overall, the library exterior did not change, new Outdoor Performance area appeared behind the library. Both library wings changed significantly, especially the southern wing, which has been completely changed. In the 2004, there was reception desk next to the entrance and a […]

The maps below show the current layout of a public library and the planned changes to the building in the future.

The maps illustrate the current layout of a public library and how it is planned to be redeveloped in the future. Overall, the library is expected to undergo significant reorganization, with reading room being reduced in size to make way for study rooms, while new facilities such as media room and outdoor seating area will […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.