🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

Image for topic: The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image shows two diagrams comparing a current road system and a proposed future road system, both with traffic lights and arrow indicators. The existing system features five "House" icons spread near junctions, frequent accidents marked by four red exclamation marks centralized around a crossroads near the school, and supermarket. In the proposed future system, a single roundabout occupies the main junction with redistributed traffic lights, the same five "House" icons unchanged, and no frequent accident locations indicated. The school, supermarket, and city road labels remain consistent in both diagrams.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagrams illustrate a current Road System and the proposed modifications in order to decrease accident rates. overall, the most significant developments include the construction of a Roundabout and addition multiple traffic lights, while resedential buildings and the school remain untouched.

At present, City Road is located along east to west, intersection with Forest Road, which Frequent accident is occured. The school lies to the northwest area while Several houses situated along Low Lane in the Southwest. The supermarket which be found in the northeast, linked to city Road by a minor cond.

In the propesed plan, a noticeable Roundabout will be constructed at the central junction of City and Forest Roads, numerous traffic lights are planned each sides of the City Road. Moreover, a new direct road will connect the roundabout to the supermarket, replacing the current route.

Word Count: 139

Answers On The Same Topic:

The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrat es the design of road system at the present and the future design of road system. Overall, some of constructions at the road look similar, such as the school, supermarket, and the residential. But, there will be a transformation for the future construction. At the present, the design of the road system […]

The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates the alters of the road system in the future, in order to decrease the road accident frequency. Overall, more traffic lights will be established and a new roundabout is planning to be build in the centre of the system Turning to the details, a traffic light system will be installed in the […]

The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The pictures illustrate how a road system is proposed to be changed in the future for a reduction in the number of accidents. Overall, the road networks will undergo a number of significant transformations, the most important of which were the addition of traffic lights and a roundabout and the removal of abrupt turns to […]

The maps show a road system as it is now and the proposed changes in future to reduce the number of accidents. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The maps give information about future changes that are proposed to a local road system to improve road safety. Overall, the proposed changes will entail the restructuring of City Road and the construction of traffic solutions, including traffic lights and a roundabout. Looking first at the northwestern side, at the intersection between City Road and […]

See All

Other Topics:

The maps shows the changes in the library from 2000 to now.

The diagrams illustrate the changes made to a library between the year 2000 and the present day. Overall, it is evident that the library has undergone significant modifications, including changes in the positions of several sections and the merging of some areas in order to create more space for users. In 2000, there were two […]

The maps below show changes in a rural area between 1970 and 2010.

The map illustrates how the rural area changed over the 40 year period. At first glance, it is clear that while school and river untouched , the rest of the areas had been changed. Now details, in 1970, school was located in the north-west corner, which stayed in the same location after 40 years later. […]

The modifications of the public park since it opened until now.

The illustration demonstrates how developing of park since it opend and today. ovarall, it is a plan illustration a puplic park, it oppendin 1920 and nowdays. There are significant difference betweem the pictures and the two time periods. In 1920, the stage of musicians lay to the north on the park and north of the […]

The following plans show recent archaeological findings at a historic site in the year 2004 and 2014.

The diagrams illustrate how the historic site changed from 2004 to 2014. Overall, the historic site underwent a number of dramatic changes, the most important of which are the construction of the ancient stadium to cater to the increase in recreational needs and the expansion of many ancient houses. As can be seen in the […]

The maps below show the changes that have take place at Queen Mary Hospital since its construction in 1960.

The diagram shows the area of Queen Mary Hospital at three different stages in its development. As can be observed from the map, Queen Mary hospital was almost totally transformed with more facilities and amendities. As can be observed from the map, shopping centre was demolished to make way for building cancer centre and pharmacy […]

The maps show the current layout of the Auroaville industrial area and the planned developments for the future. Describe the main features of the current layout and discuss the planned changes for the area

The maps illustrate the current layout of industrial area in Auroaville and the planned changes for future renovation. Overall, the industrial area is expected to be traditional town with developed infrastructure and public facilities. Both maps show the central roundabout connected with long south road and central small road. In addition, the river and farmland […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.