🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 4+: The diagram below shows what an office building looks at present and plans on future development.

Image for topic: The diagram below shows what an office building looks at present and plans on future development.
Our system will evaluate the answer based on this AI-generated description.
The image shows two floor plans: "The office building in the present" has sections labeled Kitchen, Canteen, Stock Room, WCs, Reception, four Offices, and two Grass areas; "Future planned development" includes two Offices, Stock Room, Reception, Meeting Area, Coffee Machine, WCs, with an Outdoor Seating Area and maintains Entrance in both layouts.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

There are one chart below they show two structure of the office building.The office building in the present and the office building in the Future.

Frist I talk about,the office building in the present.I can be clearly seen the present structure.in the chart the present building shows frist enterance after we enter i see the reception. The left side of the reception in the chart i see four office and and a grass area and the right side of the reception is one more grass area and the front side of the reception WCs room and a stock room and the left side of the stock room is canteen and the left side of the canteen is kitchen.this is present office building.

Now i am talking about future planned development office.First I enter the building i see reception and after that i see reception left side is one office and outdoor sitting area and the right side of the reception is a office and the next is meeting area and the front side of the reception is two offices one stock room and right side of the stock room is coffee machine and the next room is WCs room.

Word Count: 199

Answers On The Same Topic:

The diagram below shows what an office building looks at present and plans on future development.

The maps display the current layout of an office building and that of after development. Overall, almost everything will be changed in some extent, while the width of the building is likely to remain unchanged. Moreover, according to plans, the office building will house more facilities. Now, to the left of the entrance, there is […]

See All

Other Topics:

The maps below show the changes in area after construction of a hydroelectric power dam. Summarise the information by selecting and reporrting the main features, and make comparisons where relevant.

The maps illustrate a comparison of the area before and after the construction of a hydroelectric dam in 1980 and 2000. In 1980, there was a main river surrounded by large mountains, forests, and villages. The forest was rich in rare plants and animals, and people at that time made a living through agriculture. They […]

The map below is of the town od galdson. A new supermarket is planned for the town. The map shows two possible sites for the supermarket.

THE MAP BELOW ILLUSTRATES THE TOWN, CALLED GARLSDON, AND IT IS PLANNED TO BUILD A NOVEL SUPERMARKET IN ONE OF THE TWO POSSIBLE SITES. OVERALL, THE TOWN OF GARLSDON CONSISTS OF 65000 INDIVIDUALS. BOTH THE NORTH AND SOUTH SIDE OF THE TOWN IS USED FOR INDUSTRY, WHILE THE MOST PART OF IT BELONGS TO HOUSING. […]

The maps below show the changes that have taken place at the waterfont area of a town called Darwin between 2009 and 2014.

The maps above illustrate how place at the waterfont area of a town named Darwin has changed between 2009 and 2014. Looking from an overall perspective, the number of swimming pools has decreased, and several new facilities have been built. Furthermore, it is seen that industrial area has transformed into a territory with many trees […]

The maps show the changes of an office building between the present and the future. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The presented maps illustrates the transformation of an office building between nowadays and the future. Overall, it is obvious that the office building is predicted to witness significant transformations, with the most noticeable being the addition of several facilities including the offices, the canteen, the storeroom, the wcs, etc and the disappearance of the kitchen […]

The Maps show construction between 2007 and 2012 in Stratford in preparation for the 2012 London Olympic Games.

The maps show changes from 2007 and 2012 in Stratford to be prepared for London Olympic games in 2012. Overall, the city underwent remarkable developments over the time period. The most significant change is that the city became more facilitated for the 2012 London Olympic games by constructing Olympic facilities in both north and south […]

The two maps bello show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever revelant.

The two diagrams represent the road access between a city hospital in 2007 and 2010. Overall, the road layout underwent several significant changes over three years. While the ring road and City Road remained the same, a new bus station replaced the previous bus stop, a roundabout was removed, and the parking facilities were reorganized. […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.