The provided map compare the layout of the buildings and facilities at school site in 2016 and 2020.
Overall, with the number of students surging from 600 to 1000 from 2016 to 2020, there were more buildings and facilities constructed and some of the original building was moved for a better design.
The most obvious one is that one more building was constructed to accommodate the increased number of students, which was located to the right of Building 1. Besides, a new car park was also added to the site, which could be found in the eastern part of the campus, which was the original location of playground.
The playground was relocated to the south of the school and redesigned into a rectangular shape, roughly twice the size of the original. What’s also worth mentioning is that two paths were built to the school, which were used to connect the two buildings and two car parks respectively, allowing the students and cars to move around conveniently and safely.
