🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The charts show how an office looks like at present and its future development plan.

Image for topic: The charts show how an office looks like at present and its future development plan.
Our system will evaluate the answer based on this AI-generated description.
The image displays two diagrams: "Office at present" and "Future development of an office". The present layout features a central entrance leading to a reception area. To the left and right of the main building are two grass areas. The interior consists of four offices along one side, and a kitchen, canteen, and stock room along the other. A WCs area is located next to the stock room. The future development layout shows the left grass area replaced by an outdoor seating area with two sets of tables and chairs. The right grass area is replaced by a long room containing a meeting area with sofas and a table, a coffee area, and the WCs. The interior layout is changed to four offices, a stock room, and a central reception area with an entrance, while the kitchen and canteen are removed.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The plans display the current organization of a typical office, with projections for the future development of it. Overall, significant changes are planning to make to the interior of the office with the addition of several new facilities. Notably, a few features from the original layout will be remained intact, while the remainder are likely to be either expanded or removed.

At the moment, the office has a conventional layout. The bottom part of the office features four adjacent office rooms, with the entrance and a reception nearby. In front of these office blocks, a kitchen, canteen, and a stock room have been placed with WCs next to it. In addition, both the west and east sections contain a green space.

According to the proposed plan, while only two offices in the southern section will stay and be expanded, the entrance and reception will be moved to between these two. As for the northern section, those two offices from the south will be moved to here and the stock room is proposed to stay in its position. The grass area on the eastern side will be converted into a meeting area and the WCs will be moved in it, to the north with the construction of a coffee house next to it. Lastly, the green space on in the western section will be redeveloped as an outdoor sitting area, improving the access to the open area.

Word Count: 236

Answers On The Same Topic:

The charts show how an office looks like at present and its future development plan.

The maps represent the major changes that are expected to take place in an office between the present and future. Overall, it is evident that the area will undergo a substantial development, especially due to the change of infrastructure. To begin with, two of the four offices which are located along the same wall as […]

The charts show how an office looks like at present and its future development plan.

The maps shows the look of an office now and how it is expected to look like in the future. Overall, in the future, there will be less facilities, like kitchen. However, there also will be more of outdoor facilities, such as but more of the Currently, a reception desk is opposite the entrance, which […]

The charts show how an office looks like at present and its future development plan.

The two maps show the current office and how it is going to transform to a new working area for future advancement. Overall, entrance will be moved to the bottom center of the building and kitchen areas will be demolished for giving more space for the office rooms. A couple of facilities will be constructed […]

The charts show how an office looks like at present and its future development plan.

The two maps illustrate the major changes that are expected to take place in an office between the present and future. Overall, it is clear that the area will undergo a significant development, primarily due to the change of infrastructure. The most noticeable change will be the removal of grass areas, and the area will […]

See All

Other Topics:

The maps below show changes in the town of Hillingford between 2000 and 2015.

The two maps illustrate transformations in the town of Hillingford between the years 2000 and 2015. Overall, first image depicts the town before any changes, then second image presents several modidications . After the construction, the town became better than it used to be . Because, result included amenities which vital for local comunity. The […]

The maps below show the changes that took place in a coastal village between 1995 and 2025.

The maps illustrate the changes that occurred in a coastal village betewwn 1995 and 2025. Overall, the village underwent a dramatic transformation over the 30-year period. What was once a small rural village, consisting of a forest, a farm, a few houses and a fishing port developed into a large residential and tourist area. The […]

The map illustrates how a university center is now and how it will look after development.

The diagram illustrates how the university sports centre layout will change in the future. Overall, the sports centre will undergo significant redevelopment, external courts will be connected with indoor facilities. Inside objects; reception, gym, pool, changing room, seating will remain constant. In terms of new features, outdoor courts which are apart from the inside objects […]

he two diagrams below describe changes to a museum's floor plan between 2008 and 2012.

The provided image depicts the structural changes made to the South Wing of the Walton Museum between 2008 and 2012. Overall, the museum floor plan underwent significant refurbishment from 2008 to 2012. More rooms, including exhibition room, self-service cafe, restaurant, children’s play area, lift, were added, likely aiming to facilitate visitor experience. Besides that, the […]

The map shows the village park, now and 10 years ago. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The illustrative map depicts the old park as it was 10 years ago and how it looks today. Overall, apart from the entrance, all areas have changed significantly. Initially, there were 2 tennis courts in the north, but now the number has expanded to 4. In the eastern part of the park, the children’s play […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.